PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at the remaining 3rd floor Facing East (1) (800x600).jpg Pouring concrete at the remaining 3rd floor Facing East (800x600).jpg Sprinkler pipe at the 1st floor Facing North-West (800x600).jpg Started installing the sprinkler main pipe at the 1st floor Facing West (800x600).jpg Welded clips at the 2nd Floor (East Elevation).jpg
Next page Pouring concrete at the remaining 3rd floor Facing East (1) (800x600)
Pouring concrete at the remaining 3rd floor Facing East (1) (800x600)